Home
About Us
Contact Us
Integrity Evaluations
Vibration Monitoring
Rig Instrumentation
Download
News
Customers
e-mail me

Frequently Asked Questions
 

Welcome to the Frequently Asked Questions (FAQ page). Below, we have tried to answer the most common questions visitors to our Web site may have. If you find that your question is not answered on this page, please email your question or call us on 023 8046 5992.

Answers to each question are supplied as Adobe Acrobat PDF files and Acrobat Reader will be required to view and print the files. The Reader can be downloaded free of charge by clicking the Adobe link below:



 

Why should I use a Specification when Pile Integrity Evaluations are required ? (109kB)

What is NDT’s Work Procedure for carrying out the tests ? (15.9Kb)

Some piles have been built on before testing. Can they be tested with caps in place ? (7.5kB)

Our site has a piled retaining wall. Will the tests work on these piles ? (7.9kB)

Why don’t integrity tests always penetrate throughout the entire pile length ? (7.5kB)

Is there any general information of the nature of cracks within concrete piles ? (10.6kB)

What pile head preparation is required before the tests can be carried out ? (8.8kB)

Why should piles be evaluated from cast level, before any excavation or trimming ? (8.8kB)



 


|Home| |About Us| |Contact Us| |Integrity Evaluations| |Vibration Monitoring| |Rig Instrumentation| |Download| |News| |Customers|


N D Technology Ltd