Pre-configuring a Construction Profile ensures the site details are correct as well as providing important construction instruction to the operator. This includes:
- pre-charge & re-charge requirements;
- flap / bung clearance distance;
- oversupply targets;
- what to do after a delay during concreting;
Uploading a Piling Schedule via NDTDataCloud significantly reduces the risk of a pile being installed to the wrong depth or wrong diameter, plus it provides the driver with an instant confirmation of which piles remain to be installed at that contract.
The schedule function deals seamlessly with updated or revised schedules which is vital in ensuring operators are working to the latest revision.