Using the onboard PL3000/CFA system to full effect, the Oswestry based foundation specialist was able to construct the contiguous piles reliably, consistently and with excess concrete consumption kept to a minimum.
A cold, blustery day with Foundation Piling's Bauer MBG-12 rig installing 600mm diameter CFA piles for a bridge project in Taunton, Somerset.
Using the onboard PL3000/CFA system to full effect, the Oswestry based foundation specialist was able to construct the contiguous piles reliably, consistently and with excess concrete consumption kept to a minimum. This Soilmec SR-30 became the first rig to be upgraded with an NDT PL3000/CFA system following the recent merger of Keller Australia subsidiaries Vibro-Pile, Frankipile & Piling Contractors.
The versatile SR-30 is the latest addition to Keller's well established fleet of Enteco, Fundex and Mait rigs already enjoying the benefits afforded by NDT instrumentation. A stunning outlook over St Peter Port during the commissioning of a PL3000/CFA system on a Soilmec R210 owned and operated by Guernsey based contractor NSP Foundations.
|
News Pages
Please feel free to browse our news pages to see what's going on at NDT. Categories
All
Archived News
August 2024
|