|
A crisp winter's morning in East London with Keller and their new Soilmec.
This SF50 becomes the latest in Keller's rapidly expanding fleet to be fitted with a PL3000/CFA control and documentation system. This system also benefits from one of NDT's new range of wireless concrete pressure sensors. Battery powered and with an identical footprint to our wired pressure sensors, these units fit into a standard pipe boss and remove the requirement for cable connections or, where auger extensions are used, recoil drums. Foundation Piling's new PVE45-DR rig, pictured here at AGD Equipment's headquarters in Stratford-upon-Avon during the recent commissioning of its PL3000/CFA instrumentation system. The PVE45-DR is the latest in Foundation Piling's growing fleet of NDT equipped rigs and joins a range of Bauer, Tescar and Soilmec machines. |
News Pages
Please feel free to browse our news pages to see what's going on at NDT. Categories
All
Archived News
March 2026
|
