Using a combination of NDT sensors and GPS inputs, we were able to tailor an instrumentation and monitoring solution which fit GDL's specific requirements.
Having near real-time online access to the construction data via NDT's unique 'NDTDataCloud' application enabled the construction data to be monitored remotely. This proved hugely cost effective and enabled GDL's engineers to keep a very close watch on key production information as the contract progressed.
GDL Project Director Wayne Barr said 'It's been a busy few months to achieve compliance in a data driven BIM environment, GDL partnered with NDTechnology to engineer a combined geodetic, grout pressure, flow, depth and mixing system for the GDL MMX operation. Utilising, our SoilMec Pumping solution, Trimbles RTK GNSS GCS system for localised positioning, NDTs Pressure, volume and flow information, we are able to provide realtime information to our onsite operators, whilst also enabling quality assurance review from the office. The system brings a new level of quality to the deep soil mixing and mass mixing field, which will further benefit GDLs ground improvement solutions.'