Using a bespoke version of our Soil Mixing instrumentation package which had been modified specifically for this project, Keller was able to maintain stringent control of the installation of several thousand grout compacted boreholes.
All of the rigs were connected to our NDTDataCloud portal. This allowed Keller staff to view the ongoing progress of the contract on a near real-time basis, with no requirement for any engineer to visit the site.