In fitting the very latest feature-packed PL3000 systems across their range of Soilmec, Mait and Juntann machines, Keller ensures they are operating the ultimate in reliable, accurate and cost effective instrumentation systems.
With NDT's unique two-way data communication between rigs and our ground-breaking NDTDataCloud application, Keller personnel can access the rig data and key production information online within a few moments of each pile's completion. Additionally, their engineering staff are able to remotely upload comprehensive piling schedules direct to the rig computer - this is a feature which has proven to be an extremely valuable tool for their office and site based staff alike.
Pictured below is one of Keller's SF-65 rigs at a waterside location in Southampton, installing CFA piles reliably and efficiently with the aid of a PL3000/CFA system.