Working side by side with D J Scheffler during the installation of 9,500 concrete piles on a massive sustainable energy project, NDT was providing know-how and assistance to ensure efficient and economic piling.
Using PL3000 systems fitted to 5 CFA rigs, Dale and his team were able to keep concrete volumes well below a target specified by the Principal Contractor - and receiving a sizeable bonus for doing so !
Additionally, the automatic recording of boring, concreting and delay times by the PL3000 systems allowed every minute delayed to be charged back to the Main Contractor.